“So the key with Dexion was actually the design phase. The engineers understood both the racking regulations internationally, could advise on that and they planned along with the construction engineers and the architect to ensure that the building met all of Crowns needs for that facility.” Martin Cole, President Director, Crown Indonesia
Read more